Detected hardware
Checking the station...
Cameras
| Camera | Status | Port | Link | Video | Viewer |
|---|
Projectors
| Configured name | Connector | Status | Resolution |
|---|
Lamps
| Lamp | Status | Last heard | Age |
|---|
Arm
?
Go to deg
Speed: ? (station setting, read only)
Every move asks for confirmation. STOP (top right) stops the arm at once.
Lamps
| Lamp | On/off | Brightness % | CCT K | Last known |
|---|
One Bluetooth connection per action, 0.25 s between commands. Read-back sends a status request (it also advances the mesh sequence). L4/L5 are not part of Maverick and are never addressed. Lamps 7/8: one line in rig_console.json.
Projectors
| Projector | Showing | Pattern | Lit check |
|---|
LIT CHECK: all black, previews; that projector white alone, previews; share of pixels brighter by > 25 per camera. Other projectors' patterns are put back afterwards.
Cameras
| Camera | State | Exposure (read back) | Set | Full-res |
|---|
Any exposure set here becomes that camera's fixed policy in the viewer.
Projector calibration
Active set: not loaded
| Projector | Active calibration | Check drift | Recalibrate | Last result |
|---|
Both need the cube on the stand (cube tags 0-5 seen at the current angle, checked first). CHECK DRIFT: one stop from the plan, 25 patterns, decode + check against the ACTIVE calibration on glados, PASS at 2 px or less. RECALIBRATE: capture4 on the plan stops, glados decode, poses, proj_solve4, leave-one-stop-out, held-out check: the result is a CANDIDATE; Accept writes a NEW versioned set (the old one is kept for rollback). Times are from the 31 Oct runs: 3 cams 120-137 s, 4-5 cams 160-228 s per projector run, arm moves 10-22 s, processing 3-5 min.
Current operation
none